View Single Post
Old 02-18-2006, 10:50 AM   #62
Tru2Chevy
Co-Founder / Site Admin
 
Tru2Chevy's Avatar
 
Join Date: Jul 2004
Location: Ewing, NJ
Posts: 22,476
iTrader: (8)
Social Networks:

To get the car "finished":

Brakes

__ Install Rear Brake Hardware
__ Install Drums
__ Install New Master
__ Bleed Rear
__ Bleed Front


Trans

__ Cooler Lines
__ Speedo gears
__ Pan
__ Lockup kit
__ Order parts for shifter (80692)
__ Cable/Pointer (80815)
__ Neutral/Reverse Switch (80629)
__ Change Transmission Fluid/Filter


Interior

__ Install carpet
__ Install plastics
__ Install console
__ Install Seat belts
__ Install Cluster / guages
__ Install Dash pad
__ Fix door hinges
__ Install Dash Trim
__ Install HVAC


Engine

__ Y-pipe + cat back
__ Timing
__ Install New Fuel Filter
__ Change Oil/Filter


Weight Reduction

__ Remove excess wire
__ Remove Heat shields


Suspension and Tires

__ Mount 16" Tire
__ Install front Sway Bar
__ Install Rear Sway Bar
__ Install Torque Arm


Misc.

__ Clearance Hood for Air Filter
__ Install Clear Corners
__ Check all lights for functionality
__ Install Replacement Wiper Motor
__ Install Replacement Stalk

- Justin
__________________
1999 Camry - Beigemobile DD
2002 Suburban - Wife's DD
2004 Grand Cherokee - Not running / Project / Selling?

Tru2Chevy is offline   Reply With Quote