Quote:
Originally Posted by stoney2677
well the hour part would be your call. ive done jobs an hour away. either way ill help with info. i always suggest 2 small systems for a colonial or 1 system with 2 zones. with the insulation the high velocity ducts get to 4". yes thats small but where you would need 1 conventional duct you would need 3 or 4 high velocity ducts. to answer you question, yes i think if walls are being opened up you shouldnt have a prob with conventional.
|
Very cool, thanks for the info and your help, I appreciate it!
Quote:
but again basement system=1st floor attic system=2nd floor
|
That would be great, but I'm assuming the vents go through the floor when you have a basement unit. We have a mud-job ceramic tile floor in the dining room and kitchen which might pose a problem.