Thread: Final Project
View Single Post
Old 05-13-2009, 12:25 AM   #12
KirkEvil
10 Second Club
 
KirkEvil's Avatar
 
Join Date: Feb 2008
Location: Eatontown
Posts: 1,647
iTrader: (11)
Quote:
Originally Posted by firebirdat View Post
Did you CNC all those parts or were they done via mill or custom order from a machine shop?
The block was both CNC and mill. Everything was machined at rowan by me and one other teammate.

Quote:
Originally Posted by Blackbirdws6 View Post
very nice project. Would love to see it in action.

For my senior engineering project, our team created an active suspension system using hydraulics. I understand the fabrication time necessary.
That sounds like a cool project. At the beginning of each semester, about 40 different projects are pitched and you have to sign up for one. So basically you do as much as can be done in the time, then hand it off to the next team. Unfortunately I wont get to see this actually doing what it was built for, just the test runs we put it through.
__________________
1999 C5 FRC: 12.7@114
2008 TBSS: 12.48@108
2017 Silverado 2500 do you even lift breh?
KirkEvil is offline   Reply With Quote