you've heard of pre-fab buildings, right? Â*how long until that technology was spilled over into other area of construction?
i was actually working for a company that built the taj majal in AC for trump. Â*all pre-fab walls - interior, exterior, whatever. Â*they had it setup like an assembly line with the layout guys who could read blueprints (me), the guys who set the clamps where i told them to on the galvanized studs and then the welders came in afterward and made sure everything stayed together. Â*then they would go to another area where electrical was installed: light switches, outlets, cable TV, phone jacks, etc. Â*after that they went to another area where the exterior was applied. Â*basically a backer board was screwed on and concrete was sprayed on the outside. Â*had an R value of 40 or something. Â*anything else that was needed, like sheetrock and interior insulation, windows, etc. was added on site. Â*the engineering that went behind that building was incredible. Â*end-play was less than millimeters, too. Â*if a wall was out an inch it was sent back to be redone. Â*we didn't get any walls to be redone while i was there.
__________________
JSFBOA
Save a life.
N = R* fp ne fl fi fc L
|